INSTALLATION OF LIGHT WEIGHT STRUCTURE (QEB-SYSTEM) STEP 1 : MAKE BASEMENT AS PER THE BASEMENT PLAN. STEP 2 : MEASURE THE FLOOR LEVEL AND MAKE IT ALL IN SAME LEVEL. STEP 3 : DRILL HOLES IN BASEMENT CORNER SIDES FOR ANCHOR BOLT FIXING . STEP 4 : PLANT ACHOR BOLTS IN DRILLED HOLES. STEP 5 : FIX BASEPLATE AND TIGHTEN THE ACHOR BOLTS. STEP 6 : ASSEMBLE THE COLUMS, FIX BRACKETS AND FIXING ANGLE AS PER DRAWING. STEP 7 : INSTALL COLUMNS ON THE BASEPLATE AS PER THE DRAWING. STEP 8 : INSTALL GIRTH BETWEEN THE COLUMS. STEP 9 : INSTALL BRACING WIRE BETWEEN THE COLUMS USING TURNBUCKLES AND WIRE CLIPS. STEP 10 : ASSEMBLE THE RAFTERS WITH FIXING ANGLE. STEP 11 : FIX RAFTERS ON THE COLUMNS. STEP 12 : INSTALL PURLINS AND BRACING WIRES ON THE ROOF. STEP 13 : AFTER FULL INSTALLATION MAKE SURE TIGHTEN THE BRACING WIRES,BOLTS. COMPLETED LIGHTWEIGHT STEEL STRUCTURE( QEB - SYSTEM ) FOR MORE INFORMATION CLICK THE LINK-https://www.youtube.com/watch?v=pOfGi4TNSKI&t=16s